Category
ANALYSIS OF BOREHOLE WALL STABILITY OF FRACTURED ROCK FORMATION
Tang lin, Luo Pingya
1997, 19(3): 1-5. DOI: 10.3969/j.issn.1000-7393.1997.03.001
Abstract PDF
A PRACTICAL METHOD OF PREDICTION OF MAXIMUM PIPE INTRODUCING SPEED IN BINGHAM FLUID
Wang Haige, Su Yinao
1997, 19(3): 6-9. DOI: 10.3969/j.issn.1000-7393.1997.03.002
Abstract PDF
APPLICATION OF COLUMN MATCHING METHOD IN DESCRIPTIONS OF SPECIAL SHAPE OF DEVIATED WELLS
Gong Wei’an
1997, 19(3): 10-19. DOI: 10.3969/j.issn.1000-7393.1997.03.003
Abstract PDF
DISPUTES IN STUDY BUCKLE OF DRILL STRING IN HORIZONTAL WELL
Gao Baokui, Gao Deli, Wang Ping
1997, 19(3): 20-24. DOI: 10.3969/j.issn.1000-7393.1997.03.004
Abstract PDF
STUDY AND APPLICATION OF CEMENTING TECHNOLOGY WITH ROTATING LINER
Hu Xingfu, Li Yonghe, Wang Guoxin
1997, 19(3): 25-27,34. DOI: 10.3969/j.issn.1000-7393.1997.03.005
Abstract PDF
BUILD UP OF X5-J142 WELL COMPLETED WITH GLASS FIBER POLYMER CASING
Yang Fulun
1997, 19(3): 28-30. DOI: 10.3969/j.issn.1000-7393.1997.03.006
Abstract PDF
SIMULATION TEST OF GAS MOVEMENT IN CEMENT SLURRY
Zhang Houmei, Zhou Jinchu, Yang Fangyou
1997, 19(3): 31-34. DOI: 10.3969/j.issn.1000-7393.1997.03.007
Abstract PDF
DOWN HOLE TROUBLE SHOOTING TECHNIQUES IN KC-1 WELL
Liang Hongjun, Deng Xingde, Jia Lichang, Xu Zhixiong
1997, 19(3): 35-39. DOI: 10.3969/j.issn.1000-7393.1997.03.008
Abstract PDF
APPLICATION OF POSICLOSE CORING TECHNOLOGY IN BOHAI GOLF
Jiang Wei, Tu Xuexiang
1997, 19(3): 40-44. DOI: 10.3969/j.issn.1000-7393.1997.03.009
Abstract PDF
STUDY ON NUMERICAL SIMULATION FOR 3-DIMENSIONAL FRACTURE PROPAGA-TION IN HYDRAULIC FRACTURING
Zhang Ping, Zhao Jinzhou, Guo Dali, Chen Wenbin, Tian Jidong
1997, 19(3): 53-59,69. DOI: 10.3969/j.issn.1000-7393.1997.03.013
Abstract PDF
A FUZZY METHOD FOR SELECTING WELL AND FORMATION IN REFRACTING
Jiang Tingxue
1997, 19(3): 60-62,80. DOI: 10.3969/j.issn.1000-7393.1997.03.014
Abstract PDF
A METHOD FOR PARAMETER DESIGN AND PLAN OF PUMPING WELL WITH SUCKER ROD PUMP
Ye Liping, Cui Peiqing
1997, 19(3): 63-69. DOI: 10.3969/j.issn.1000-7393.1997.03.015
Abstract PDF
CALCULATION OF CRITICAL FLOW RATE FOR HORIZONTAL WELL IN BOTTOM-WA-TER OIL RESERVOIR
Duo Hong’en
1997, 19(3): 70-75. DOI: 10.3969/j.issn.1000-7393.1997.03.016
Abstract PDF
MEASURING FLUID CONTENT IN MULTIPHASE FLUID APPLYING 3-PHASE PULSE CONDUCTANCE METHOD
Li Mingzhong, Wang Weiyang, Han Guoqing, Zhang Qi
1997, 19(3): 76-80. DOI: 10.3969/j.issn.1000-7393.1997.03.017
Abstract PDF
SAND PRODUCTION PREDICTION AND CONTROL IN THE MIDDLE OR LATER PERIOD OF OIL PRODUCING
Wang Dexin, Lu Congrong
1997, 19(3): 81-84. DOI: 10.3969/j.issn.1000-7393.1997.03.018
Abstract PDF
DEVELOPMENT OF V-1 TYPE CORROSION INHIBITOR FOR ACIDIZING BY MUD ACID
Zhang Junchuang, Hu Zhonghou, Sun Qinghong
1997, 19(3): 85-87. DOI: 10.3969/j.issn.1000-7393.1997.03.019
Abstract PDF
THE CALCULATION EQUATIONS USED IN DESIGN OF FOAM FRACTURING
Liu Congbiao, Peng Songliang, Zhang Shoujun, An Jiuquan,
1997, 19(3): 88-91,98. DOI: 10.3969/j.issn.1000-7393.1997.03.020
Abstract PDF