Yang Fulun. BUILD UP OF X5-J142 WELL COMPLETED WITH GLASS FIBER POLYMER CASING[J]. Oil Drilling & Production Technology, 1997, 19(3): 28-30. DOI: 10.3969/j.issn.1000-7393.1997.03.006
Citation: Yang Fulun. BUILD UP OF X5-J142 WELL COMPLETED WITH GLASS FIBER POLYMER CASING[J]. Oil Drilling & Production Technology, 1997, 19(3): 28-30. DOI: 10.3969/j.issn.1000-7393.1997.03.006

BUILD UP OF X5-J142 WELL COMPLETED WITH GLASS FIBER POLYMER CASING

  • In order to get knowledge about the watered out situation of productive formations, water flooding efficiency and residual oil saturation of Gudao reservoir of Shengli Oil Field which fell in its late development period, X5-J142 well was completed with glass fiber polymer casing in the interval of 1209.40~1290.90 m out off the total casing length 1330 m. The characteristics, completion operation requirements and engineering technology were introduced in the paper.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return