Category
Review on study progress of seismic while drilling technology
SU Yi’nao, XU Yi, SHENG Limin, DOU Xiurong
2010, 32(5): 1-7.
Abstract
Study on Dynamic Kill Drilling technology in deepwater drilling
GAO Yonghai, SUN Baojiang, ZHAO Xinxin, XU Peng
2010, 32(5): 8-12.
Abstract
Analysis of bending moment on the bit in sidetrack drilling
LI Zifeng, ZHANG Xin, WANG Peng, LI Runqi
2010, 32(5): 13-16.
Abstract
Improvement and application of the calculation method of oil and gas ascending velocity
SONG Guangjian, YAN Jianqi, WANG Lizhen, WANG Chunyun, LU Yinsheng
2010, 32(5): 17-19.
Abstract
Hydraulics calculation of deepwater riserless mud recovery drilling
LIU Jie, CHEN Guoming, ZHOU Changjing, YIN Zhiming
2010, 32(5): 20-23.
Abstract
First application of the new-style rotary steering tool, Power Drive Xceed, in west of South China Sea
LI Long, WANG Lei, WANG Chenglin, CHEN Cong, LIU Hexing
2010, 32(5): 24-27.
Abstract
508 mm casing tieback technology on jacket in oilfield development
GU Chunwei, HUANG Yi, DUAN Zehui, GUO Yongbin
2010, 32(5): 28-31.
Abstract
Tube completion successful application in QHD32-6-A platform
ZHANG Jijiang, ZHANG Xin, CAI Guangjie, DONG Lei
2010, 32(5): 32-34.
Abstract
Experimental research on the scaling damage in coalbed methane reservoir caused by drilling fluid
WANG Weiying, TAO Shan, HUANG Lei, ZOU Laifang, TIAN Zhonglan, YANG Henglin
2010, 32(5): 35-38.
Abstract
Design and select of resisting corrosion cement slurries by carbon dioxide for high temperature deep well
ZHANG Cong, ZHANG Jingfu, QIAO Hongyu, PENG Bangzhou
2010, 32(5): 39-43.
Abstract
Laboratory study on grain size of silica in strength recession of heavy oil thermal recovery cement
ZHANG Ying, CHEN Dajun, LUO Yang, LI Jing, DENG Yingjiang
2010, 32(5): 44-47.
Abstract
Application and analysis on External Casing Packer in well completion and cementing technology
KONG Tao, ZHAO Jianxin, ZHANG Hongjun, MA Yanfeng, WANG Guoqing
2010, 32(5): 48-52.
Abstract
Application of latex cement slurry system in deep horizontal well
SU Boyong, JIANG Hongtu, MA Shumei, HUO Weiwei
2010, 32(5): 53-55.
Abstract
The development of the well control technique in natural gas drilling
WU Zhijun, CHEN Gang, LANG Shumin, LONG Bin, WANG Yong, LI Wei
2010, 32(5): 56-60.
Abstract
Oil-gas-water three-phase inflow performance relationships for imperfect wells
WU Xiaodong, SHANG Qinghua, HE Shien
2010, 32(5): 61-63.
Abstract
Development process of branch horizontal well productivity formulas
LIANG Feng, MENG Weilong, LIU Xiaohui
2010, 32(5): 64-68.
Abstract
A deliverability analysis of herringbone well under open hole series completion system
CHEN Yang, XIONG Youming, CHEN Zongyi, XU Jianian, ZHANG Lin
2010, 32(5): 69-73.
Abstract
Productivity analysis and parameter optimization for deep hydraulic jet perforation wells
WU Xiutian, TIAN Shubao, ZHANG Peng, WANG Jinxiu, JIANG Wei, HAN Jing
2010, 32(5): 74-78.
Abstract
Study on fracture height controlling and diagnose technology in Artala Depression
ZHAO Anjun, HU Jintang, ZHAO Zhengjia, CAI Bo, NIU Yongze, XIE Fenghua
2010, 32(5): 79-81.
Abstract
Research on viscosity loss of association polymer in Bohai SZ36-1 Oilfield
WANG Chengsheng, HUANG Bo, YI Fei, CHEN Shijia, ZHU Hongqing, SUN Yanping
2010, 32(5): 82-85.
Abstract
Study on oil-water interfacial tension of anionic gemini surfactant
FANG Wenchao, TANG Shanfa, HU Xiaodong, CHEN Tingting, SHAN Haidan, YAN Shuangxi
2010, 32(5): 86-89.
Abstract
3-D physical modeling of enhanced oil recovery by surfactant-polymer flooding in horizontal well
ZHAO Qingmin, YUE Xiang, SUN Yulong, LI Hongxin, JI Yueying
2010, 32(5): 90-93.
Abstract
Application of a rubber particle profile control system in complex fault-block oilfield
ZOU Zhenghui, LIN Yongjun, LI Jianxiong, WANG Honghua, LI Qinglong, CHAI Zhigang
2010, 32(5): 94-97.
Abstract
Application of controllable thermochemistry technology in Liaohe Shuguang oil region
DING Zhenwu, WANG Shanqiang, ZHOU Yang, WANG Duo, LIU Shu, XIONG Fan
2010, 32(5): 98-100.
Abstract
Technology of separate layer sand control and eccentric flooding in 177.8 mm casing injection wells
SONG Xianmin, HE Yawei, XIAO Guohua, YIN Caixia, WANG Jinzhong, LI Changyou
2010, 32(5): 101-104.
Abstract
Design and application of split-type double plug cement casing head
ZHOU Zhanyun, ZHANG Yijia, YONG Jie
2010, 32(5): 105-106.
Abstract
Integrated rescue techniques in dealing with blowout caused by wellhead casing head damage
XIE Hua, LIU Jinhuan, XIE Qing, XING Ming
2010, 32(5): 107-109.
Abstract
Complex sticking treatment in logging transfer of Well H203H
HOU Shidong, ZHANG Yaxin, ZHANG Changchun, CUI Gang, XIAO Tao, WANG Rui
2010, 32(5): 110-112.
Abstract
Sectional production technology for horizontal wells
WANG Jinzhong, XIAO Guohua, CHEN Lei, WANG Fang
2010, 32(5): 113-115.
Abstract
Application of McWiLL broadband wireless technology to single-well wireless monitoring in Sulige Gasfield
SONG Hanhua, ZHU Xun, MA Bing, FENG Pengxin, RU Zhijuan, WANG Hui
2010, 32(5): 116-119.
Abstract
Discussion on the compression of reservoir rock
LI Chuanliang
2010, 32(5): 120-124.
Abstract