LIU Hancheng, LIU Yue, GENG Tong. Discussion on demand-oriented drilling and production integration control mode[J]. Oil Drilling & Production Technology, 2013, 35(3): 121-124.
Citation: LIU Hancheng, LIU Yue, GENG Tong. Discussion on demand-oriented drilling and production integration control mode[J]. Oil Drilling & Production Technology, 2013, 35(3): 121-124.

Discussion on demand-oriented drilling and production integration control mode

  • Providing the development benefit of oil and gas field is a system engineering project, which not only depends on the various cost control methods during operation process, the enhance technology of operation efficiency for equipment and system and optimization technology of development program, but also closely relates to wellbore full life cycle management from well establishing to well completion. Aiming at the existing management mode, some problems were analyzed in this paper including a series of development contradictions caused by link disconnection among well establishing, well completion and well usage and a large number of late repair workload and costs. Form the view of wellbore full life cycle management, the demand-oriented drilling and production integration control mode was proposed, which is helpful to establish the organic connection between construction and usage.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return