WANG Xianzhou, JIANG Ming, DENG Zengku, XIA Jinggang, WANG Baojun, LIU Congsheng. Drilling technology for Well Su76-1-20H[J]. Oil Drilling & Production Technology, 2013, 35(2): 26-30.
Citation: WANG Xianzhou, JIANG Ming, DENG Zengku, XIA Jinggang, WANG Baojun, LIU Congsheng. Drilling technology for Well Su76-1-20H[J]. Oil Drilling & Production Technology, 2013, 35(2): 26-30.

Drilling technology for Well Su76-1-20H

  • To improve the development efficiency of low porosity and low permeability gas reservoirs, A long lateral horizontal well was drilled in Sulige gas field, which is Well Su76-1-20H. Based on the borehole structure and wellbore trajectory design for the well, the difficulties were proposed, which were long lateral, large friction torque, hard trajectory control, small wellbore size, high circulation pump pressure, difficult wellbore cleaning treatment, wellbore collapse, drilling tool deformation, technical casing wearing, and so on. The key techniques and application effect were illustrated detailed from the viewpoint of trajectory control, friction torque prediction, geosteering technique, drilling fluid technique, wellbore repairing technique, and complex accident prevention. The well creates the record of the longest horizontal section on land within CNPC, with the horizontal length of 2 856 m, and safety and smooth drilling process, which proves important guiding role for efficiently develop low porosity and low permeability oil and gas fields. 
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return