YANG Li-ming, REN Teng-yun, ZHANG Hong-jun, ZHANG Wei, TIAN Shan-ze, WEI Wen-xing. Application of corrugated flexible liner in Shengli Oilfield[J]. Oil Drilling & Production Technology, 2006, 28(3): 16-18. DOI: 10.3969/j.issn.1000-7393.2006.03.006
Citation: YANG Li-ming, REN Teng-yun, ZHANG Hong-jun, ZHANG Wei, TIAN Shan-ze, WEI Wen-xing. Application of corrugated flexible liner in Shengli Oilfield[J]. Oil Drilling & Production Technology, 2006, 28(3): 16-18. DOI: 10.3969/j.issn.1000-7393.2006.03.006

Application of corrugated flexible liner in Shengli Oilfield

  • Many lost circulations,abnormal high pressure and well bore caving occur often in Shengtuo block,Shengli Oilfield caused by complex underground conditions since its long development history by over forty years.Corrugated flexible liner could be expanded to isolate water zone and trouble zones,and to solve the problems such as different drilling pressure existing within a open hole and other problems.Compared with other expandable tubing,this technology has been used in many wells in Russia and solved thousands of wells problems as well as being applied in other countries.A successful application of profiled liner has solved water channeling and lost circulation problems in Shengli Oilfield.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return