Bai Liangqing, Feng Jinghai.et al, . CEMENTING OF?139.7mm CASING IN WELL BAI 12X3[J]. Oil Drilling & Production Technology, 2001, 23(2): 22-24,84. DOI: 10.3969/j.issn.1000-7393.2001.02.007
Citation: Bai Liangqing, Feng Jinghai.et al, . CEMENTING OF?139.7mm CASING IN WELL BAI 12X3[J]. Oil Drilling & Production Technology, 2001, 23(2): 22-24,84. DOI: 10.3969/j.issn.1000-7393.2001.02.007

CEMENTING OF?139.7mm CASING IN WELL BAI 12X3

  • Well 12X3 is an important exploration well drilled in Jidong Oilfield, with an actual total depth of 4415m. During the drilling of ?215.6mm hole, well collapse, cutter lost, lost circulation and gas invasion frequently occur, and an irregular hole profile is build, which is very bad for cementing operation. In this case, a lot of preparation work is carried out, and the cementing program, as well as cement slurry properties, are modified to meet the actual downhole condition. During the field operation, the procedures are strictly followed, and a successful cementing job is completed.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return