Citation: | Lin Jia’en. USE OF PRESSURE BUILDUP TESTING FOR DETERMINING WELL STIMULATION CANDIDATE AND EVALUATING WELL STIMULATION EFFECTIVENESS[J]. Oil Drilling & Production Technology, 1996, 18(2): 75-78,94. DOI: 10.3969/j.issn.1000-7393.1996.02.017 |