Lin Jia’en. USE OF PRESSURE BUILDUP TESTING FOR DETERMINING WELL STIMULATION CANDIDATE AND EVALUATING WELL STIMULATION EFFECTIVENESS[J]. Oil Drilling & Production Technology, 1996, 18(2): 75-78,94. DOI: 10.3969/j.issn.1000-7393.1996.02.017
Citation: Lin Jia’en. USE OF PRESSURE BUILDUP TESTING FOR DETERMINING WELL STIMULATION CANDIDATE AND EVALUATING WELL STIMULATION EFFECTIVENESS[J]. Oil Drilling & Production Technology, 1996, 18(2): 75-78,94. DOI: 10.3969/j.issn.1000-7393.1996.02.017

USE OF PRESSURE BUILDUP TESTING FOR DETERMINING WELL STIMULATION CANDIDATE AND EVALUATING WELL STIMULATION EFFECTIVENESS

  • Combining with the well testing analysis theory,this paper summarizes systematically the method to determine well stimulation candidate and evaluate stimulation effectiveness using pressure buildup testing data.Field examples are provided to illustrate the applications of pre-stimulation and post-stimulation pressure buildup testing data.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return