CEMENTING TECHNIQUE OF LOST CIRCULATION FORMATION IN EASTERN SICHUAN
-
-
Abstract
Gas-bearing reservoir in Eastern Sichuanthat buried deeply,has great gas production and complex formation pressure system.Because existing different pore pressure,lost circulation often take place during drilling.According to different lost situations,cementing technique were adopted to improve cementing quality and meet the requirement of high gas field development.
-
-