MA Zhenfeng, YU Xiaolong, YAN Zhiyuan, LI Xiaokun, WANG Hongjuan, WU Qian. Drilling and completion technology for YYP-3-horizontal well[J]. Oil Drilling & Production Technology, 2014, 36(3): 23-26. DOI: 10.13639/j.odpt.2014.03.006
Citation: MA Zhenfeng, YU Xiaolong, YAN Zhiyuan, LI Xiaokun, WANG Hongjuan, WU Qian. Drilling and completion technology for YYP-3-horizontal well[J]. Oil Drilling & Production Technology, 2014, 36(3): 23-26. DOI: 10.13639/j.odpt.2014.03.006

Drilling and completion technology for YYP-3-horizontal well

  • In order to develop the technology for drilling horizontal wells of continental shale gas in Erdos Basin, Yanchang oilfield drilled the Well YYP-3 in 2013 which has the large offset distance. By optimizing well configuration, strengthening the well trajectory control, optimizing the drilling bit and BHA and using the whole oil-based fluid and float casing running technology, no downhole troubles occurred during drilling and the casing was run in place at one time. The drilling time was 7 days shorter than design; average ROP of the whole well was up to 4.91 m/h and the ROP of horizontal section was up to 13.16 m/h, creating a number records in domestic drilling of shale gas horizontal wells. The actual drilling effect of this well shows that the drilling and completion technologies in this paper can be promoted and used in continental shale gas exploitation, and provide a reference for drilling of horizontal shale gas wells with large offset distance in other part of China.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return