孙建成, 王宝新, 苗希庆. 胜利油田郝科1井套管挤毁的启示[J]. 石油钻采工艺, 1998, 20(4): 21-27. DOI: 10.3969/j.issn.1000-7393.1998.04.004
引用本文: 孙建成, 王宝新, 苗希庆. 胜利油田郝科1井套管挤毁的启示[J]. 石油钻采工艺, 1998, 20(4): 21-27. DOI: 10.3969/j.issn.1000-7393.1998.04.004
Sun Jiancheng, Wang Baoxin, Miao Xiqing. ENLIGHTENMENT OF CASING COLLAOSE IN WELL HAOKE 1 OF SHENGLI OIL FIELD[J]. Oil Drilling & Production Technology, 1998, 20(4): 21-27. DOI: 10.3969/j.issn.1000-7393.1998.04.004
Citation: Sun Jiancheng, Wang Baoxin, Miao Xiqing. ENLIGHTENMENT OF CASING COLLAOSE IN WELL HAOKE 1 OF SHENGLI OIL FIELD[J]. Oil Drilling & Production Technology, 1998, 20(4): 21-27. DOI: 10.3969/j.issn.1000-7393.1998.04.004

胜利油田郝科1井套管挤毁的启示

ENLIGHTENMENT OF CASING COLLAOSE IN WELL HAOKE 1 OF SHENGLI OIL FIELD

  • 摘要: 郝科1井是胜利油田为在东营凹陷盐岩层下深层寻找大气田的科学探索井,设计井深5500m,目的层孔二段。?244.5mm技术套管为高强度SM-110T套管,下深4324.80m,封住了3395.50~4250m厚854.50m的盐岩、青盐和紫红色软泥岩,并于1996年5月12日固井。1997年2月20日用?215.gmm钻头取心钻进至5476.33m,起钻至3945.90m突然于钻,套管变形量6.48mm,变化率0.72mm/月。由于未钻到目的层,也未见油气显示,决定用?200mm钻头加深。同年5月30日钻至5807.81m,起钻到3759.33m卡钻,经强力震击和上提2090kNK卡。推算52d套管变形量159mm,变化率为9.17mm/月。后下?89mm测井仪检查套管,上起时在3850m卡死.解除后用?152mm钻头通并,结果下到3594.42m就下不去了,只得结束施工。文中介绍了套管变形情况和得到的几点启示。

     

    Abstract: Well Haoke 1 is a research well to pursued large gas field in the lower deep zone underneath salt formation in Dongying depression of Shengli oil field. It has a design depth of 5000 m with EK2 as the target formation. The 244. 5 mm high strength SM-110T casing as intermediate casing was run in at 4324. 8 m to seal off the salt, gypsum and purple colored ooze zone with a thickness of 854. 5 m from 3395. 5 m to 4250 m. It was cemented on 12, May, l996 during trip out after cored drilling to 5476. 33 m with 215. 9 mm bit on 20, Feb.,1997, the pipe was stuck suddenly at 3945. 9 m, with casing deformation of 6. 48 mm and variation rate of 0. 72 mm/month. No oil showing was observed due to non target forma-tion drilled. It was determined to deepen the well with 200 mm bit. Pipe sticking occurred at 3759. 33 m while tripping out after drilled to 5807. 81 m on 30, May, the same year. It was freed through strong jarring and pulling up. It is estimated that 52d casing had a deformation of 15. 9 mm and a variation rate of 9. 17 mm/month. Later a 89 mm logging tool was run to check fhe casing’ The tool was stuck at 3850 m whilF pulling out. After unfrozen,a 152 mm bit was used to drift the well and had a tight point at 3594. 42 m, resulting in an early fin-ished operation. The casing deformation and several points of enlightenment are presented in the paper.

     

/