同井抽注采油树配套技术研究

徐振东 宋文礼 马成晔 张继刚 杨进 苗福全

徐振东, 宋文礼, 马成晔, 张继刚, 杨进, 苗福全. 同井抽注采油树配套技术研究[J]. 石油钻采工艺, 2009, 31(2): 86-90.
引用本文: 徐振东, 宋文礼, 马成晔, 张继刚, 杨进, 苗福全. 同井抽注采油树配套技术研究[J]. 石油钻采工艺, 2009, 31(2): 86-90.
The characteristic and alteration experience of Bohai Sea self-management oilfield’s Christmas tree[J]. Oil Drilling & Production Technology, 2009, 31(2): 86-90.
Citation: The characteristic and alteration experience of Bohai Sea self-management oilfield’s Christmas tree[J]. Oil Drilling & Production Technology, 2009, 31(2): 86-90.

同井抽注采油树配套技术研究

详细信息
  • 中图分类号: TE931.1

The characteristic and alteration experience of Bohai Sea self-management oilfield’s Christmas tree

  • 摘要: 为了满足不同增产工艺要求, 解决“同井抽注”工艺难点,根据中海油渤海自营油田采油树结构及技术特点对其进行了改进,在油管挂和上法兰处按照合理的布局钻孔,分别利用油管挂矩形密封与电缆橡胶护套配合密封、配套的三铁四胶的胶块膨胀密封电缆,开辟了电缆穿越通道。使用一种由普通电缆穿越器改造后的双联式电缆穿越器,耐压等级达到20 MPa,价格只是整体固化的1/4。对同井抽注工艺,将采油树由单管采油管柱改造为同井双管柱,在原井油管四通的基础上增加1个新油管四通,通过上下2个四通内的油管挂来坐挂双管柱;对同井注气采油采用下面挂114 mmEU油管,上面挂73 mm NEW VAM油管的管柱组合,解决双管柱在采油四通的布置、悬挂问题。改进方案在现场使用过程中获得了良好的效果。
  • [1] [1]国家经济贸易委员会. SY/T 5127-2002井口装置和采油树规范[S].
    SY/T 5127-2002. Specification for Wellhead and Christmas Tree Equipment[S].
    [2]张均.海上油气田完井手册——井口设备[M].北京:石油工业出版社,1998-03.
    ZHANG Jun. Offshore well completion[M]. Beijing: Petroleum Industry Press, 1998-03.
    [3]熊金华,郝继红. Αри?улин Ρ Χ. 新型井口装置[J].国外油田工程,2000,16(7):53.
    XIONG Jinhua, HAO Jihong, Αрифулин Ρ Χ. New wellhead installation[J]. Foreign Oilfield Engineering, 2000, 16(7): 53.
    [4]贾士栋.采油平台采油树及管汇的设置[J]. 中国海上油气:工程,1999,11(5):6-8.
    JIA Shidong. Layout of Christmas tree and wellhead manifold on offshore platform[J]. China Offshore Oil and Gas: Engineering, 1999, 11(5): 6-8.
    [5]李龙,陈国卓.高压油气井口装置阀体端部螺纹法兰的设计[J].石油机械,2005,33(6):27-28.
    LI Long, CHEN Guozhuo. Design of threaded flange for valve end of high-pressure wellhead[J]. China Petroleum Machinery, 2005, 33(6): 27-28.
    [6]孟爱鲁,王恩成,王维星,等.新型双功能井口封井装置[J].石油机械,2003,31(6):26-27.
    MENG Ailu, WANG Encheng, WANG Weixing, et al. A double-function well plugging device[J]. China Petroleum Machinery, 2003, 31(6): 26-27.
    [7]郭文德,向河,蒙永立,等.新型活动式双管热采井口装置[J].石油机械,2003,31(2):31-32.
    GUO Wende, XIANG He, MENG Yongli, et al. New adjustable two-string wellhead for thermal recovery[J]. China Petroleum Machinery, 2003, 31(2): 31-32.
    [8]文志雄,张斌,辜志宏,等. 井口装置和采油树的特种设备制造许可[J].石油机械,2007,35(2):58-60.
    WEN Zhixiong, ZHANG Bin, GU Zhihong, et al. Certificate special equipment of wellhead equipment and Christmas tree[J]. China Petroleum Machinery, 2007, 35(2): 58-60.
    [9]郭文德,蔡罡,彭辉,等. KR14—337—65E型热采井口装置的研制[J].石油机械,2007,35(8):37-38.
    GUO Wende, CAI Gang, PENG Hui, et al. Development and application of Model KR14-337-65E wellhead assembly for thermal recovery[J]. China Petroleum Machinery, 2007, 35(2): 37-38.
    [10]王秀文,李文学.组装化抽油机井口装置[J].油气田地面工程,1996,15(3):11-12.
    WANG Xiuwen, LI Wenxue. Assembling rod-pumped wellhead equipment[J]. Oil-Gasfield Surface Engineering, 1996, 15(3): 11-12.
    [11]初吉泽,许梅,许德喜. HKY65—21型海上井口装置[J].石油机械,1999,27(1):42-43.
    CHU Jize, XU Mei, XU Dexi. Model HKY65—21 offshore wellhead[J]. China Petroleum Machinery, 1999, 27(1): 42-43.

    [1]国家经济贸易委员会. SY/T 5127-2002井口装置和采油树规范[S].
    SY/T 5127-2002. Specification for Wellhead and Christmas Tree Equipment[S].
    [2]张均.海上油气田完井手册——井口设备[M].北京:石油工业出版社,1998-03.
    ZHANG Jun. Offshore well completion[M]. Beijing: Petroleum Industry Press, 1998-03.
    [3]熊金华,郝继红. Αри?улин Ρ Χ. 新型井口装置[J].国外油田工程,2000,16(7):53.
    XIONG Jinhua, HAO Jihong, Αрифулин Ρ Χ. New wellhead installation[J]. Foreign Oilfield Engineering, 2000, 16(7): 53.
    [4]贾士栋.采油平台采油树及管汇的设置[J]. 中国海上油气:工程,1999,11(5):6-8.
    JIA Shidong. Layout of Christmas tree and wellhead manifold on offshore platform[J]. China Offshore Oil and Gas: Engineering, 1999, 11(5): 6-8.
    [5]李龙,陈国卓.高压油气井口装置阀体端部螺纹法兰的设计[J].石油机械,2005,33(6):27-28.
    LI Long, CHEN Guozhuo. Design of threaded flange for valve end of high-pressure wellhead[J]. China Petroleum Machinery, 2005, 33(6): 27-28.
    [6]孟爱鲁,王恩成,王维星,等.新型双功能井口封井装置[J].石油机械,2003,31(6):26-27.
    MENG Ailu, WANG Encheng, WANG Weixing, et al. A double-function well plugging device[J]. China Petroleum Machinery, 2003, 31(6): 26-27.
    [7]郭文德,向河,蒙永立,等.新型活动式双管热采井口装置[J].石油机械,2003,31(2):31-32.
    GUO Wende, XIANG He, MENG Yongli, et al. New adjustable two-string wellhead for thermal recovery[J]. China Petroleum Machinery, 2003, 31(2): 31-32.
    [8]文志雄,张斌,辜志宏,等. 井口装置和采油树的特种设备制造许可[J].石油机械,2007,35(2):58-60.
    WEN Zhixiong, ZHANG Bin, GU Zhihong, et al. Certificate special equipment of wellhead equipment and Christmas tree[J]. China Petroleum Machinery, 2007, 35(2): 58-60.
    [9]郭文德,蔡罡,彭辉,等. KR14—337—65E型热采井口装置的研制[J].石油机械,2007,35(8):37-38.
    GUO Wende, CAI Gang, PENG Hui, et al. Development and application of Model KR14-337-65E wellhead assembly for thermal recovery[J]. China Petroleum Machinery, 2007, 35(2): 37-38.
    [10]王秀文,李文学.组装化抽油机井口装置[J].油气田地面工程,1996,15(3):11-12.
    WANG Xiuwen, LI Wenxue. Assembling rod-pumped wellhead equipment[J]. Oil-Gasfield Surface Engineering, 1996, 15(3): 11-12.
    [11]初吉泽,许梅,许德喜. HKY65—21型海上井口装置[J].石油机械,1999,27(1):42-43.
    CHU Jize, XU Mei, XU Dexi. Model HKY65—21 offshore wellhead[J]. China Petroleum Machinery, 1999, 27(1): 42-43.
  • [1] 张绍槐.  采油作业应用井筒完整性标准 . 石油钻采工艺, 2018, 40(5): 601-613. doi: 10.13639/j.odpt.2018.05.012
    [2] 高德利, 张武辇, 李文勇.  南海西江大位移井钻完井工艺分析研究 . 石油钻采工艺, 2004, 26(3): 1-6. doi: 10.3969/j.issn.1000-7393.2004.03.001
    [3] 王怀明, 武继辉, 陈新民.  排砂采油工艺的应用 . 石油钻采工艺, 2002, 24(6): 69-71. doi: 10.3969/j.issn.1000-7393.2002.06.024
    [4] 王卓飞, 商昌柱, 郭仕洋.  浅层稠油油藏蒸汽选注分采工艺技术 . 石油钻采工艺, 2001, 23(3): 61-63,86. doi: 10.3969/j.issn.1000-7393.2001.03.020
    [5] 安策, 陈尚礼.  延迟固井技术研究及应用 . 石油钻采工艺, 2000, 22(4): 30-33. doi: 10.3969/j.issn.1000-7393.2000.04.009
    [6] 王金友, 王德金, 张书进, 潘卫国, 韩淑鹃.  聚合物驱层系上、下返机械封堵工艺技术 . 石油钻采工艺, 2000, 22(2): 70-71,79. doi: 10.3969/j.issn.1000-7393.2000.02.020
    [7] 石建设, 顾春元, 姜建胜, 陶晓玲, 冯恩山.  定向井分层注水工艺研究与应用 . 石油钻采工艺, 2000, 22(1): 46-49. doi: 10.3969/j.issn.1000-7393.2000.01.012
    [8] 张学锋, 祝明华, 杨顺贵, 杨建国.  砂岩油藏高含水期封堵大孔道工艺技术研究及应用 . 石油钻采工艺, 1999, 21(5): 87-90. doi: 10.3969/j.issn.1000-7393.1999.05.020
    [9] 薛清祥, 尤秋彦.  喷射泵-电潜泵接替举升深抽工艺技术研究 . 石油钻采工艺, 1999, 21(5): 107-110. doi: 10.3969/j.issn.1000-7393.1999.05.025
    [10] 薛凤云, 王运涛, 张维平.  小井眼采油工艺技术井深界限研究 . 石油钻采工艺, 1999, 21(6): 63-67. doi: 10.3969/j.issn.1000-7393.1999.06.014
    [11] 王金友, 付爱德, 张玉荣, 朱振锐, 黄明.  聚合物驱双层分注工艺技术 . 石油钻采工艺, 1998, 20(2): 67-71. doi: 10.3969/j.issn.1000-7393.1998.02.018
    [12] 徐克彬, 徐念平.  雁翎油田注氮气提高采收率工艺技术 . 石油钻采工艺, 1998, 20(3): 69-75. doi: 10.3969/j.issn.1000-7393.1998.03.017
    [13] 蔡长立, 吕维国, 孙锐, 侯爱萍.  滩海多目标大位移延伸井的完井方法及固井工艺技术措施 . 石油钻采工艺, 1997, 19(6): 42-46. doi: 10.3969/j.issn.1000-7393.1997.06.007
    [14] 蔡志刚, 李书阁, 王绍维, 隋胜利.  华北油田机械采油工艺现状及发展方向 . 石油钻采工艺, 1996, 18(5): 83-90. doi: 10.3969/j.issn.1000-7393.1996.05.019
    [15] 杨洪志, 张瑞永, 宋振云, 高剑峰.  塞平一井分段试油压裂工艺技术研究 . 石油钻采工艺, 1996, 18(2): 52-57. doi: 10.3969/j.issn.1000-7393.1996.02.013
    [16] 罗英俊.  大力发展采油工艺技术为陆上石油工业发展和提高效益作贡献 . 石油钻采工艺, 1995, 17(4): 8-14. doi: 10.3969/j.issn.1000-7393.1995.04.002
    [17] 李宪文.  陕甘宁盆地中部气田碳酸盐岩储层酸化工艺技术研究 . 石油钻采工艺, 1995, 17(3): 66-70. doi: 10.3969/j.issn.1000-7393.1995.03.015
    [18] 朴新国, 梁福民.  定向井机械堵水工艺 . 石油钻采工艺, 1993, 15(1): 77-78. doi: 10.3969/j.issn.1000-7393.1993.01.018
    [19] 陈路源, 李小奇.  文东油田气举采油工艺技术 . 石油钻采工艺, 1993, 15(6): 78-83. doi: 10.3969/j.issn.1000-7393.1993.06.014
    [20] 陈桂和.  JY341-115深井和定向井分层注水工艺技术 . 石油钻采工艺, 1993, 15(1): 59-63. doi: 10.3969/j.issn.1000-7393.1993.01.015
  • 加载中
计量
  • 文章访问数:  2957
  • HTML全文浏览量:  18
  • PDF下载量:  45
  • 被引次数: 0
出版历程
  • 收稿日期:  2019-05-03
  • 修回日期:  2019-05-03
  • 刊出日期:  2009-05-04

同井抽注采油树配套技术研究

  • 中图分类号: TE931.1

摘要: 为了满足不同增产工艺要求, 解决“同井抽注”工艺难点,根据中海油渤海自营油田采油树结构及技术特点对其进行了改进,在油管挂和上法兰处按照合理的布局钻孔,分别利用油管挂矩形密封与电缆橡胶护套配合密封、配套的三铁四胶的胶块膨胀密封电缆,开辟了电缆穿越通道。使用一种由普通电缆穿越器改造后的双联式电缆穿越器,耐压等级达到20 MPa,价格只是整体固化的1/4。对同井抽注工艺,将采油树由单管采油管柱改造为同井双管柱,在原井油管四通的基础上增加1个新油管四通,通过上下2个四通内的油管挂来坐挂双管柱;对同井注气采油采用下面挂114 mmEU油管,上面挂73 mm NEW VAM油管的管柱组合,解决双管柱在采油四通的布置、悬挂问题。改进方案在现场使用过程中获得了良好的效果。

English Abstract

徐振东, 宋文礼, 马成晔, 张继刚, 杨进, 苗福全. 同井抽注采油树配套技术研究[J]. 石油钻采工艺, 2009, 31(2): 86-90.
引用本文: 徐振东, 宋文礼, 马成晔, 张继刚, 杨进, 苗福全. 同井抽注采油树配套技术研究[J]. 石油钻采工艺, 2009, 31(2): 86-90.
The characteristic and alteration experience of Bohai Sea self-management oilfield’s Christmas tree[J]. Oil Drilling & Production Technology, 2009, 31(2): 86-90.
Citation: The characteristic and alteration experience of Bohai Sea self-management oilfield’s Christmas tree[J]. Oil Drilling & Production Technology, 2009, 31(2): 86-90.
参考文献 (1)

目录

    /

    返回文章
    返回