翟慧颖, 杨进, 周建良, 刘书杰, 杨立平, 蔡战胜. 隔水导管与土壤胶结强度试验分析研究[J]. 石油钻采工艺, 2008, 30(2): 36-37.
引用本文: 翟慧颖, 杨进, 周建良, 刘书杰, 杨立平, 蔡战胜. 隔水导管与土壤胶结强度试验分析研究[J]. 石油钻采工艺, 2008, 30(2): 36-37.
ZHAI Huiying, YANG Jin, ZHOU Jianliang, LIU Shujie, YANG Liping, CAI Zhansheng. Analysis and research of cementing strength tests between water isolation tube and soil[J]. Oil Drilling & Production Technology, 2008, 30(2): 36-37.
Citation: ZHAI Huiying, YANG Jin, ZHOU Jianliang, LIU Shujie, YANG Liping, CAI Zhansheng. Analysis and research of cementing strength tests between water isolation tube and soil[J]. Oil Drilling & Production Technology, 2008, 30(2): 36-37.

隔水导管与土壤胶结强度试验分析研究

Analysis and research of cementing strength tests between water isolation tube and soil

  • 摘要: 为研究隔水导管与水泥浆、水泥浆与海底土之间作用机理,在天津塘沽渤海湾海滨地区做了系列模拟试验,根据试验结果分析了隔水导管与水泥浆固结力随时间的变化规律以及水泥浆与海底土层固结强度随时间的变化规律。在海上隔水导管钻入法施工中,隔水导管的入泥深度确定与海底土性质及水泥浆固结质量有很大关系。隔水导管钻入法施工一般使用海水钻进,钻完固井后隔水导管外面与水泥浆直接接触,而水泥浆又与海底土层直接接触。通过模拟试验结果得出,水泥环强度突变点是发生在注入水泥浆后的48 h的时间段。该研究成果能够为海上隔水导管钻入法固井作业施工和钻井隔水导管入泥深度的确定提供科学依据。

     

    Abstract: In order to study the action mechanism of water isolation tube and cement slurry, cement slurry and submarine soil, series simulation tests are done in Bohai Bay beachside in Tanggu of Tianjin. According to test results, the rule varying with time of the force fixing the loope between water isolation tube and cement slurry and the consolidating strength between cement slurry and submarine soil layer as well. In construction of offshore riser burrowing into method, the driving depth determination of riser is greatly related with submarine soil properties and cement slurry consolidation quality. Riser drilling construction usually drills with sea water, after cementing the outside of riser has direct contact with cement slurry, while cement slurry has direct contact with submarine soil layer. It concludes that catastrophe point of cement ring strength occurs in 48 h time segment after cement slurry drilling in by simulation test. The research result can provide scientific basis for offshore cementing operation construction of riser drilling and driving depth determination of drilling riser.

     

/

返回文章
返回