[1]
|
[1]贺志刚,陈平.随钻震击器安放位置优化设计[J].石油矿场机械,2001,30(5):22-25. HE Zhigang, CHEN Ping. Designing the drilling jar placement for better jarring performance[J]. Oil Field Equipment, 2001, 30(5): 22-25. [2]贺志刚,陈平,李汉兴.上击器的震击动载荷计算[J]. 石油机械,1999,27(8):4-6. HE Zhigang,CHEN Ping, LI Hanxing. Calculation of jarring dynamic load of top jars[J]. Oil Field Equipment, 1999, 27(8): 4-6. [3]张焱,陈平,施太和. 关于随钻震击器的研究[J].石油矿场机械,1998,27(4):8-10. ZHANG Yan,CHEN Ping, SHI Taihe. Study on jar with drilling[J]. Oil Field Equipment, 1998, 27(4): 8-10. [4]高洪志,吕拴录,李鹤林,等.随钻震击器断裂事故分析及预防[J].石油钻采工艺,1991,13(6):29-35. GAO Hongzhi, LV Shuanlu, LI Helin,et al.Analysis and prevention on fracture accident of drilling jar[J].Oil drilling & Production Technology, 1991,13(6): 29-35. [5]潘志勇,刘永刚,王新虎,等. 2起震击器花键心轴断裂原因分析及改进措施 [J]. 石油矿场机械,2009,38(7):67-70. PAN Zhiyong, LIU Yonggang, WANG Xinhu, et al. Analysis on the fracture of two drill ing jar’ s splined mandrel and improvement measures[J]. Oil Field Equipment, 2009, 38(7): 67-70. [6]WANG J K, KALSI M S, CHAPELLE R A, BEASLEY T R. A practical approach to jarring analysis[R]. SPE 16 155. [7]冯耀荣,吕拴录,李鹤林,等. 随钻震击器断裂分析 [J]. 理化检验—物理分册,1994,30(1):50-53. FENG Yaorong, LV Shuanlu, LI Helin, et al. Analysis on fracture drilling jar.[J].Physical Testing and Chemical Analysis Parta Physical Testing, 1994, 30(1): 50-53. [8]陈朝达,翁加平. 深井随钻震击器的设计计算[J].石油矿场机械,1999,28(5):30-32. CHEN Zhaoda,WENG Jiaping. Design and calculation of the drilling jar in depth well[J]. Oil Field Equipment, 1999, 28(5): 30-32. [9]张玉英. QJ159A 整体机械式随钻震击器的研制及应用 [J]. 石油机械,2008,36(9):88-89. ZHANG Yuying. Development and application of integral mechanical jar while drilling[J]. Oil Field Equipment, 2008, 36(9): 88-89.
[1]贺志刚,陈平.随钻震击器安放位置优化设计[J].石油矿场机械,2001,30(5):22-25. HE Zhigang, CHEN Ping. Designing the drilling jar placement for better jarring performance[J]. Oil Field Equipment, 2001, 30(5): 22-25. [2]贺志刚,陈平,李汉兴.上击器的震击动载荷计算[J]. 石油机械,1999,27(8):4-6. HE Zhigang,CHEN Ping, LI Hanxing. Calculation of jarring dynamic load of top jars[J]. Oil Field Equipment, 1999, 27(8): 4-6. [3]张焱,陈平,施太和. 关于随钻震击器的研究[J].石油矿场机械,1998,27(4):8-10. ZHANG Yan,CHEN Ping, SHI Taihe. Study on jar with drilling[J]. Oil Field Equipment, 1998, 27(4): 8-10. [4]高洪志,吕拴录,李鹤林,等.随钻震击器断裂事故分析及预防[J].石油钻采工艺,1991,13(6):29-35. GAO Hongzhi, LV Shuanlu, LI Helin,et al.Analysis and prevention on fracture accident of drilling jar[J].Oil drilling & Production Technology, 1991,13(6): 29-35. [5]潘志勇,刘永刚,王新虎,等. 2起震击器花键心轴断裂原因分析及改进措施 [J]. 石油矿场机械,2009,38(7):67-70. PAN Zhiyong, LIU Yonggang, WANG Xinhu, et al. Analysis on the fracture of two drill ing jar’ s splined mandrel and improvement measures[J]. Oil Field Equipment, 2009, 38(7): 67-70. [6]WANG J K, KALSI M S, CHAPELLE R A, BEASLEY T R. A practical approach to jarring analysis[R]. SPE 16 155. [7]冯耀荣,吕拴录,李鹤林,等. 随钻震击器断裂分析 [J]. 理化检验—物理分册,1994,30(1):50-53. FENG Yaorong, LV Shuanlu, LI Helin, et al. Analysis on fracture drilling jar.[J].Physical Testing and Chemical Analysis Parta Physical Testing, 1994, 30(1): 50-53. [8]陈朝达,翁加平. 深井随钻震击器的设计计算[J].石油矿场机械,1999,28(5):30-32. CHEN Zhaoda,WENG Jiaping. Design and calculation of the drilling jar in depth well[J]. Oil Field Equipment, 1999, 28(5): 30-32. [9]张玉英. QJ159A 整体机械式随钻震击器的研制及应用 [J]. 石油机械,2008,36(9):88-89. ZHANG Yuying. Development and application of integral mechanical jar while drilling[J]. Oil Field Equipment, 2008, 36(9): 88-89. |