龚俊,叶俊红,秦永辉,李勇,安继彬,周洪涛. 埕岛油田冻胶调剖剂过滤砂管和填砂管综合剪切性能评价[J]. 石油钻采工艺,2019,41(5):657-662.. DOI: 10.13639/j.odpt.2019.05.017
引用本文: 龚俊,叶俊红,秦永辉,李勇,安继彬,周洪涛. 埕岛油田冻胶调剖剂过滤砂管和填砂管综合剪切性能评价[J]. 石油钻采工艺,2019,41(5):657-662.. DOI: 10.13639/j.odpt.2019.05.017
GONG Jun, YE Junhong, QIN Yonghui, LI Yong, AN Jibin, ZHOU Hongtao. Comprehensive evaluation on the shear performance of gel profile control agent through sand-screen pipe and sand pack in the Chengdao Oilfield[J]. Oil Drilling & Production Technology, 2019, 41(5): 657-662.. DOI: 10.13639/j.odpt.2019.05.017
Citation: GONG Jun, YE Junhong, QIN Yonghui, LI Yong, AN Jibin, ZHOU Hongtao. Comprehensive evaluation on the shear performance of gel profile control agent through sand-screen pipe and sand pack in the Chengdao Oilfield[J]. Oil Drilling & Production Technology, 2019, 41(5): 657-662.. DOI: 10.13639/j.odpt.2019.05.017

埕岛油田冻胶调剖剂过滤砂管和填砂管综合剪切性能评价

Comprehensive evaluation on the shear performance of gel profile control agent through sand-screen pipe and sand pack in the Chengdao Oilfield

  • 摘要: 埕岛海上油田平台大部分油水井均采用防砂管柱,冻胶体系在现场注入和地下渗流过程中均存在剪切问题。针对上述问题,在实验室内模拟施工过程中滤砂管及地层对冻胶的剪切作用,研究了埕岛油田调剖用冻胶体系经滤砂管及填砂管剪切后的黏度保留率、成胶时间、成胶强度以及剪切后对填砂管的封堵效果。实验结果表明,优选的冻胶配方在通过滤砂管剪切后黏度保留率大于80%,冻胶的成胶时间略有增加,但对成胶后冻胶的强度无影响;继续通过不同渗透率填砂管后,冻胶的黏度保留率分别为88.1%和94.3%,填砂管剪切后的冻胶基液成胶时间有所延长,但成胶强度不变,且成胶后对不同渗透率填砂管的封堵率分别为95%、98.9%和99.7%。表明优选的冻胶调剖体系在经过滤砂管及地层剪切后仍可以满足现场施工要求。

     

    Abstract: Sand control strings are used in most oil and gas wells on the platforms of the Chengdao Offshore Oilfield, and gel systems suffer shear in the process of injection and underground flow. To solve this problem, the shear actions of sand-screening pipe and strata on the gel in the process of construction were simulated in the laboratory, and the viscosity retention rate, gelation time, gel strength and sand pack plugging effect of the gel system used for the profile control in the Chengdao Oilfield after being sheared by sand-screening pipe and sand pack were studied. It is experimentally indicated that after the shear of the optimized gel formula by the sand-screening pipe, the viscosity retention rate is higher than 80%, the gelation time is increased slightly, but the gel strength is not changed. After through the sand packs with different permeability, the viscosity retention rate of the gel is 88.1% and 94.3%, respectively, the gelation time of base fluid is prolonged slightly, but the gel strength is unchanged, and the plugging rate of the gel in the sand packs of different permeability is 95%, 98.9% and 99.7%, respectively. It is revealed that after being sheared by sand-screening pipe and strata, the optimized gel system can still satisfy the requirements of field construction.

     

/