赵彦泽, 李战奎, 苑仁国, 王洪昊. 太古界潜山界面卡取方法及应用[J]. 石油钻采工艺, 2018, 40(S1): 55-57. DOI: 10.13639/j.odpt.2018.S0.015
引用本文: 赵彦泽, 李战奎, 苑仁国, 王洪昊. 太古界潜山界面卡取方法及应用[J]. 石油钻采工艺, 2018, 40(S1): 55-57. DOI: 10.13639/j.odpt.2018.S0.015
ZHAO Yanze, LI Zhankui, YUAN Renguo, WANG Honghao. Method and application of Archaean buried hill interface identification[J]. Oil Drilling & Production Technology, 2018, 40(S1): 55-57. DOI: 10.13639/j.odpt.2018.S0.015
Citation: ZHAO Yanze, LI Zhankui, YUAN Renguo, WANG Honghao. Method and application of Archaean buried hill interface identification[J]. Oil Drilling & Production Technology, 2018, 40(S1): 55-57. DOI: 10.13639/j.odpt.2018.S0.015

太古界潜山界面卡取方法及应用

Method and application of Archaean buried hill interface identification

  • 摘要: 太古界变质岩潜山经历多期构造运动的改造,且长期遭受剥蚀风化,形成了裂缝型储层、孔隙-裂缝型储层,易发生井漏、井喷或地层坍塌等井下事故,所以在钻井作业过程中要求卡准潜山界面并及时下入技术套管。为了卡准潜山界面,避免钻井工程复杂情况的发生,根据潜山特征、钻井工程参数特征、岩性特征、邻井对比特征等,总结出了一套太古界潜山界面的卡取方法,在分析太古界变质岩潜山特点的基础上,建立了“钻、岩、录、电”四步法潜山界面卡取流程,并归纳总结出“敏感参数法”最佳潜山界面卡取方法。实践过程中,利用该方法能够卡准潜山界面,实际界面和录井卡取界面误差小,为潜山的取心、测试和钻井工程安全提供了保障。

     

    Abstract: Archaeozoic metamorphic buried hill has experienced the transformation of multi-stage tectonic movement and has been eroded and weathered for a long time.Consequently, fractured reservoir and pore-fractured reservoir are formed, which are prone to downhole accidents like well loss, blowout or well collapse.Therefore, accurate buried hill interface identification and in-time intermediate casing running is required.To accurately identify the buried hill interface and eliminate the downhole accidents, based on the characteristics of buried hill, drilling parameters, lithology characteristics, and contrast characteristics of offset wells, a set of methods for Archean buried hill interface identification is summarized.On the basis of analyzing the characteristics of Archean metamorphic buried hill, a four-step method of buried hill interface identification with drilling, rock, logging and electricity is established, and the best method for buried hill interface identification with "sensitive parameter method" is summarized.Using the method, the buried hill interface is accurately identified with small errors between the actual interface and interface by logging, which provides a guarantee for the safety of buried hill coring, testing and engineering.

     

/

返回文章
返回