张浩, 陈国明, 郑纯亮, 寇贝贝. 内波参数对半潜式钻井平台漂移量的影响[J]. 石油钻采工艺, 2015, 37(1): 39-42. DOI: 10.13639/j.odpt.2015.01.009
引用本文: 张浩, 陈国明, 郑纯亮, 寇贝贝. 内波参数对半潜式钻井平台漂移量的影响[J]. 石油钻采工艺, 2015, 37(1): 39-42. DOI: 10.13639/j.odpt.2015.01.009
ZHANG Hao, CHEN Guoming, ZHENG Chunliang, KOU Beibei. Effect of internal wave parametres on drifting quantity of semi-submersible drilling platform[J]. Oil Drilling & Production Technology, 2015, 37(1): 39-42. DOI: 10.13639/j.odpt.2015.01.009
Citation: ZHANG Hao, CHEN Guoming, ZHENG Chunliang, KOU Beibei. Effect of internal wave parametres on drifting quantity of semi-submersible drilling platform[J]. Oil Drilling & Production Technology, 2015, 37(1): 39-42. DOI: 10.13639/j.odpt.2015.01.009

内波参数对半潜式钻井平台漂移量的影响

Effect of internal wave parametres on drifting quantity of semi-submersible drilling platform

  • 摘要: 基于KdV 理论和莫里森方程,对内波作用力进行理论计算。获得平台在内波作用下的运动时程曲线,发现在内波作用下,平台产生沿内波入射方向的最大漂移量和反向漂移,并在内波过境后不断振荡最终回到平衡位置。针对内波上层流体厚度、最大流速、入射角度和水深等4 个因素对平台漂移量的影响进行规律性研究,发现上层流体厚度与水深的变化对平台的漂移量影响不大,最大流速应作为首要监测因素,内波入射角可在最大流速确定的基础上适当调整监测范围。监测到强内波流后,应停止平台作业,断开作业管柱,适当放松迎流向锚链。

     

    Abstract: Based on KdV theory and Morison equation, the theoretical calculation is done for the acting force of internal wave. The motion time travel curve of platform under the action of internal wave is figured out. It is discovered that, under the action of internal wave, the platform has the maximum drifting quantity and reverse drifting in the incidence direction of internal wave, and constantly vibrates and finally returns to the balanced position after the internal wave passes. According to effects of 4 factors, namely, upper fluid thickness of internal wave, maximum flow rate, angle of incidence and water depth on the platform drifting quantity, the research on law is conducted, and it is discovered that the changes of upper fluid thickness and water depth do not leave great effects on the platform drifting quantity, the maximum flow rate should be regarded as the primary monitoring factor, and the monitoring scope of angle of incidence of internal wave may be properly adjusted on the basis of determined maximum flow rate. After the strong internal wave current is monitored, the platform operation should be stopped, the operation pipe column should be disconnected, and the anchor chain towards the current direction should be properly loosened.

     

/

返回文章
返回